COMPLETED AND ONGOING PROJECTS

So far Green Age has executed a number of projects and some of these turnkey projects include;

Project: Design, Supply and installation of VRF air conditioning
Client: Federal Ministry of Justice Abuja
Year: September 2008 – December 2008

Completed

Project: Design, Supply and Installation of VRF air-conditioning
Client: Brass LNG limited Lagos
Year: March 2007 – July 2007

Completed

Project: Installation of sophisticated clean room air-conditioning system.
Client: PZ plc Lagos
Year: September 2007- January 2008

Completed

Project: Design and Installation of Central air-conditioning system.
Client: at Grand Towers Hotels Which is a 5 star Boutique Hotel managed by Mantis Collections.
Year: July 2011-December 2011.

Completed

Project: Consultation Services (Design, Price Estimation, Tendering and Contractor Selection) of Fire Safety, Air-conditioning, Lighting and Power (Clean and Dirty Power)
Client: for Nigeria Deposit Insurance Corporation Zonal Offices.
Year: July 2011

Ongoing

Project: Plumbing, Air-Conditioning and Electrical services
Client: a luxury apartment complex at Apo, Abuja.
Year: December 2011 – March 2012.

Completed

Project: Installation of central Air-Condition
Client: Grand Pela Boutique Hotel Managed by Mantis Collections Durumi Abuja.
Year: February 2012-

Ongoing

Project: Design of Airport Baggage Conveyor System
Client: GTA Domestic Airport Lagos.
Year:

Completed

Project: Installation of central Air-Condition
Client: Grand Pela Boutique Hotel Managed by Mantis Collections Durumi Abuja.
Year: February 2012-

Ongoing

Project: Design of Airport Baggage Conveyor System
Client: GTA Domestic Airport Lagos.
Year:

Completed

Project: Design of Airport Baggage Conveyor System
Client: Aminu Kano International Airport Kano.
Year:

Completed

Project: Central Air-conditioning maintenance
Client: NDIC Abuja.
Year:

Ongoing

Project: Maintenance of automatic fire fighting sprinkler system
Client: Unity bank Head office Abuja
Year:

Ongoing

Project: Noise reduction of News Studios
Client: Aljazeera News Network studios Abuja
Year: November 2012

Completed

Project: Design of return Air duct system
Client: Aljazeera News network studios
Year: January 2013

Ongoing

Our engineers have also been involved in award winning design competitions across the united Kingdom such as the design of low carbon mechanical and electrical services for the proposed Olympic swimming pool complex at Nelson Mandela park Leister UK.

Shopping Basket